1. Customer prepares basically schematic drawings
2. Our company reviews feasibility and submits a quotation if feasible
3. Quote prototype sample cost and obtain customer’s confirmation
4. Make prototype samples or 3D samples and verify basic function performance
a. 3D‑printed plastic parts are low‑cost; small‑size parts cost under US$100.
b. PCBA cost for general electronic devices ranges from US$300 to US$500 (including technical solutions).
c. Processing cost for CNC metal parts is US$30‑US$50.
5. Quote the tooling cost and unit price
6. Receive modification requests from the customer
7. Optimize specifications and remake prototype samples for function verification
8. Remake prototype samples if further revisions are requested by the customer
9. Quote final tooling cost and final unit price after customer confirmation
10. Customer confirm for tooling manufacturing
11. Tooling production (minor adjustments during manufacturing can be arranged upon discussion)
a. Lead time of tooling is 30‑45 days.
12. Tooling first time trial plastic injection, verify basic functions, discuss improvements and modify the tooling
13. Tooling second time trial plastic injection; repeat function checks and revision work
14. After all details are confirmed, apply surface treatment to molds and produce mass‑production samples
15. Mass production
a. MOQ for mass production is 1000 pieces.
16. Defects solvable at the assembly stage shall be resolved on the production line.
17. Modify the tooling after production completion to prepare for the next batch production.
18. Products with our OEM/ODM are listed below:
Metal stand, heating products, backpacks & cushions, cooling fans, peltier cooling products,
smartphone accessories, Bluetooth devices, USB charging cradle, plastic products,
small kitchen home appliances, LED lighting products